| *Note: this will be rolled into the cleaning system video once deployed. | *Note: this will be rolled into the cleaning system video once deployed. | ||
| - | After the cleaning system removes the bulk contents of the jar, it continues to the jar-inversion tunnel. It passively | + | After the cleaning system removes the bulk contents of the jar, it continues to the jar-inversion tunnel. It passively flips the jars upside-down. There are cutouts |
| - | Jars are then staggered and spaced by a spiral drive. Jars are only taken one at a time. The surface which the jars first contact [TODO rephrase] | + | Jars are then staggered and spaced by a spiral drive. Jars only advance |
| - | When the all of the 5 spiral positions are occupied, a gantry picks up the batch. It uses suction cups with a vacuum ejector to lift the jars. The gantry moves over and places the jars into a washing rack. This process repeats until the washing rack is full and the system pauses. | + | When all of the 5 spiral positions are occupied, a gantry picks up the batch. It uses suction cups with a vacuum ejector to grip the jars. The gantry moves and places the jars into a washing rack. This process repeats until the washing rack is full and the system pauses. |
| An operator then puts the full washing into a dishwasher and replaces the rack with an empty one. | An operator then puts the full washing into a dishwasher and replaces the rack with an empty one. | ||